•The windows went in this week with the exception of the nine specialty windows on the front of the house and the quatrefoil window above the front door.
•A/C is being installed.
•Fireplaces are in as well.
We have met with electrical…so it will be next, I am sure. There was a challenge for lightning in the great room because it goes up all three stories.
💜 Tam




